OEM/ODM Process

OEM / ODM Process

A Clear Path
to Production.

A structured OEM/ODM process helps both teams confirm product, material, quality, timing, and commercial details before bulk production.

Brief
Develop
Sample
Confirm
Produce
Ship

Six Stages

From Brief to Bulk Production

Clear checkpoints help protect fit, materials, workmanship, timing, and communication.

01

Brief

Share the product category, references or tech pack, size range, estimated quantity, target price if available, timing, and destination.

02

Develop

Review materials, trims, patterns, sizing, construction, decoration, labels, packaging, and workable solutions.

03

Sample

Develop and refine the sample for fit, measurements, construction, and workmanship. Standard sampling is approximately 3–5 business days.

04

Confirm

Finalize specifications, sample approval, colors, pricing, quantities, materials, testing, packaging, and the production plan.

05

Produce

Proceed with bulk production and the agreed quality workflow. Standard bulk production is approximately 30 days; complex projects may require up to 45 days.

06

Ship

Complete final and packing checks, then prepare shipment according to the agreed EXW, FCA, FOB, or other confirmed trade terms.

Planning Guide

Typical Production Timeline

Bulk production begins only after product specifications, materials, samples, quantities, pricing, packaging, and commercial terms are confirmed. The timeline below shows typical planning windows from quotation to shipment-ready goods; final timing depends on product complexity, material availability, colour quantity, and sample approvals.

01

Quotation

1–3 days

After receiving a complete tech pack or product brief.

02

First Sample

3–5 days

Timing may vary for custom fabrics or special techniques.

03

Sample Revision

3–5 days

Estimated time for each revision round.

04

Bulk Production

30–45 days

Production timing starts after deposit confirmation.

300 / 500 pcs

General / Activewear MOQ per style

150 pcs

MOQ per colour

100,000–150,000 pcs

Monthly capacity

Typical bulk lead time by product category
Product CategoryBulk Lead Time
Woven ApparelAbout 30 days
KnitwearAbout 30 days
ActivewearAbout 30 days
Special-Technique ProductsAbout 45 days

Lead-time basis: Bulk production timing begins after deposit confirmation. International transit time is not included.

Peak season: Peak-season lead times may vary and will be confirmed during quotation and production planning.

Ready to Start the Process?

Send the available project information so we can identify the right first step.

Scroll to Top